Nuvon Automation

NuvoCx pilot partners open

Completions management, built for commissioning.

NuvoCx tracks every system from mechanical completion to handover: ITRs, CVCs, punch items and notices of energisation, with phase gates and a permanent audit trail. Built by a commissioning engineer for Australian resources, energy and heavy-industrial projects.

The call is a walkthrough of NuvoCx on your own system list. Tell us how you track completions today and we will show where it fits.

Phase gate System 20-P-101 · Stage 2 Example data
RecordTypeGate
ITR-A-0412Static checksPassed
ITR-B-0413Loop checkPassed
ITR-B-0414Loop checkPassed
ITR-B-0419Motor runOpen
PI-0077Punch, cat AOpen
CVC-0031System roll-upBlocked
NOE-0008EnergisationBlocked
Records
48 / 48
Held
4
Cleared

> done. 4 records held at the gate

Phase gates

No energisation until the prerequisites are closed.

A system cannot move to the next phase until its ITRs, CVCs and category A punch items are in the right state, and every sign-off stays on a permanent record.

NuvoCx

Completions management for capital projects

One place for every system\'s checks, certificates and sign-offs, in place of spreadsheets, paper and email threads. Your pilot team decides what gets built next.

  • Project, area, system and subsystem, with progress rolled up at every level
  • ITRs (A, B, C) with evidence attached to each check
  • ITR-to-CVC roll-up, so certificates reflect the real state of the checks
  • Punch items by category A, B and C, each with an owner and a status
  • Phase gates and NOE prerequisites enforced before the next stage
  • An audit trail of who signed what, and when, that cannot be edited
Become a pilot partner
NuvoCx Area 20 progress Example data
ITRs closed128 / 212
CVCs signed64 / 96
Open punch, cat A17

Recent activity

09:12ITR-B-0413ITR closed
09:08CVC-0031CVC signed
08:55PI-0077Punch raised
08:41ITR-B-0414ITR closed

How it works

From mechanical completion to handover

Four stages, each one gated by the one before it.

01

Structure

Project, area, system and subsystem set up from your system list, with the checklist templates you use.

02

Execute

Checklists completed against each system, with evidence attached and every sign-off recorded.

03

Gate

ITRs roll up into CVCs, and phase gates and NOE prerequisites hold the next stage until they are met.

04

Hand over

Punch items closed by category, with the full record of checks and sign-offs behind every system.

Records

What your team works with

Each record type is tracked against the system it belongs to.

ITR checklists

Inspection and test records in classes A, B and C, with evidence on each check.

System/Class/Check/Evidence/Sign-off

Certificates of verification

CVCs that roll up from the ITRs beneath them.

System/ITRs/Status/Signatories

Notices of energisation

NOEs that cannot be issued until their prerequisites are closed.

System/Prerequisites/Approver/Date

Punch list

Items in categories A, B and C, each with an owner and a status.

Item/Category/Owner/Status/Closed

Pilot

Start with one system

A pilot covers one defined part of a project. We load your system list and checklist templates, your team runs it on real work, and you decide what NuvoCx does next.

Discuss a pilot
Slice
One area or a set of systems on a live or upcoming project
Setup
We load your system list and checklist templates
Support
Direct, from the commissioning engineer who built it
Feedback
Your team decides what gets built next
Terms
One-page agreement covering scope, confidentiality and liability

Contact

Book a 20-minute demo call

The call is a walkthrough of NuvoCx on your own system list. Email a short note on how you track completions today and we will show how it would run. Anonymised details are fine.

aisse@nuvonautomation.com
  • A system or subsystem list, anonymised if needed
  • The ITR and punch templates you use now
  • How you track completions today
  • Your handover date and who signs off